top of page
![Rendering- corner 'Osler and SW Marine Dr'](https://static.wixstatic.com/media/b6dcbb_5869613207344d8398deb1007bdb5685~mv2.png/v1/fill/w_702,h_694,al_c,q_90,enc_avif,quality_auto/b6dcbb_5869613207344d8398deb1007bdb5685~mv2.png)
Rendering- corner 'Osler and SW Marine Dr'
![](https://static.wixstatic.com/media/b6dcbb_346bf9c249fc43e593e70c98a2c6bf44~mv2.png/v1/fill/w_980,h_660,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/b6dcbb_346bf9c249fc43e593e70c98a2c6bf44~mv2.png)
![](https://static.wixstatic.com/media/b6dcbb_b95701e26aad41a6bf0c75f5a863f5f1~mv2.png/v1/fill/w_950,h_397,al_c,q_90,enc_avif,quality_auto/b6dcbb_b95701e26aad41a6bf0c75f5a863f5f1~mv2.png)
![Rendering- corner 'Osler and SW Marine Dr'](https://static.wixstatic.com/media/b6dcbb_5869613207344d8398deb1007bdb5685~mv2.png/v1/fill/w_702,h_694,al_c,q_90,enc_avif,quality_auto/b6dcbb_5869613207344d8398deb1007bdb5685~mv2.png)
Rendering- corner 'Osler and SW Marine Dr'
1/35
8888 Osler Street
Vancouver
BC, Canada
Oversaw the selection of a General Contractor, and reviewed monthly progress draws with owners. Two major issues arose in the excavation, first was 3 barrels of cure oil undetected in preliminary investigations this was dealt with efficiently and I only shut down the site for 4 days. The second was at level -4 when the GC hit an underground river, this was plugged by bringing in a team from Alberta and we shut down the site for 6 days. By efficiently researching the problems I was able to continue construction and reduced shutdown times thus saving the owners massive change orders, further, my knowledge of construction law assisted in the process.