top of page

Hunting Rd

Abbotsford

BC, Canada

Managed a team of consultants in BC and California for the design of a Cannabis Production Facility, incorporating a fully integrated system with “pods” of self-contained units to maximize harvest times. The overall facility will consist of a 48,000 sqft warehouse and a 3,800 sqft extraction plant.


Design Details 

  • Security and traceability

  • Employee training and compliance standards

  • Efficient removal/ recycling of water 

  • Electrical/ Mechanical 

  • Transportation and logistics for retail, packaging, and processing

  • Testing capabilities and protocols

  • An accurate description of grow facility, operations planning, and production process (including equipment, soil, and fertilizers to be used)

Team List

Surveyor- South Fraser Land Survey

Prefabricated Steel Structure- Byrtex.com

Structural Engineering- neale-engineering.com

Geotechnical Engineer- ablegeo.com

Mechanical & Electrical- AJ Pumphouse

bottom of page